Skip to main content
Call (800) 747-2312
SPH-2.0 Hot Box
Hot BoxesStepp Mfg

SPH-2.0 Hot Box

8-12 weeks. Contact us for current availability.

Overview

3-ton (2.0 cubic yard) asphalt hot box in a compact tow-behind configuration with air-jacketed heating and gravity discharge. Load it at the plant in the morning and patch until it's gone, material stays workable all day.

Key Features

3-ton (2.0 cubic yard) capacity

Tow-behind configuration

Air-jacketed heating with gravity discharge

Propane or diesel burner

Insulated body

Auto temperature controls

Who This Is For

Smaller operations that need material kept hot without stepping up to the largest hot box in the line. Tow-behind configuration lets you bring the hot box to the job site behind a pickup truck, load at the plant, drive to the work zone, and have workable material all day.

Ideal Applications

Small-crew pothole patching with hot mix all day

Remote job sites far from the asphalt plant

Township and rural road patching programs

Utility cut restoration with maintained material temperature

What Sets It Apart

Air-jacketed heating keeps the load at working temperature without scorching the material, and gravity discharge places it without shoveling from an open bed. At 3 tons (2.0 cubic yards), you carry enough for a full day of typical patching in a compact tow-behind package. No CDL required for towing, any crew member with a pickup truck can mobilize.

Common Upgrade Path

Small crews hauling hot mix in open truck beds or coolers, or departments using cold patch because they couldn't keep hot mix warm long enough to use it.

When to Consider a Different Model

If you consistently need more than 3 tons per day, ask BEC about larger SPH capacities.

Stepp Mfg SPH-2.0 Hot Box

Frequently Asked Questions

Who is the SPH-2.0 Hot Box best suited for?

Smaller operations that need material kept hot without stepping up to the largest hot box in the line. Tow-behind configuration lets you bring the hot box to the job site behind a pickup truck, load at the plant, drive to the work zone, and have workable material all day.

What are the main applications for the SPH-2.0 Hot Box?

The SPH-2.0 Hot Box is ideal for: Small-crew pothole patching with hot mix all day; Remote job sites far from the asphalt plant; Township and rural road patching programs; Utility cut restoration with maintained material temperature.

What sets the SPH-2.0 Hot Box apart from other hot boxes?

Air-jacketed heating keeps the load at working temperature without scorching the material, and gravity discharge places it without shoveling from an open bed. At 3 tons (2.0 cubic yards), you carry enough for a full day of typical patching in a compact tow-behind package. No CDL required for towing, any crew member with a pickup truck can mobilize.

When should I consider a different model instead of the SPH-2.0 Hot Box?

If you consistently need more than 3 tons per day, ask BEC about larger SPH capacities.

What is the typical upgrade path from the SPH-2.0 Hot Box?

Small crews hauling hot mix in open truck beds or coolers, or departments using cold patch because they couldn't keep hot mix warm long enough to use it.

Interested in the SPH-2.0 Hot Box?

Our Stepp Mfg specialists can answer your questions, provide pricing, or schedule a hands-on demo.

Call (800) 747-2312